Wednesday 27 May 2015

May 27: More fixing stage work

A lot of the cabinetry is in, as well as the stairs! (nice to have a site visit and not climb a ladder!)

Firstly the kitchen and loungeroom (including our bay window)


 Now to the wet areas:

Bathroom (well, the shower recess anyway - I seem to have missed a photo of the bathroom proper)

WC:

and laundry:

We also added a new fanlight above the hallway door:
 

Our new stairs:
 
 

Moving upstairs we have the bathroom:

study:
(although the headroom is better suited for some):
and one of the bedrooms:
Fromt he outside we can see our new "privacy" (for our neighbours) screens, deck and pergola:


 

Monday 4 May 2015

May 5: plastering mostly complete

The plastering is pretty much complete.  Most of the spotted gum flooring is in and looking good! Our cabinetry starts getting installed on Wednesday.

First, the obligatory external shots




The lounge and kitchen




Study nook and pantry


Bathroom, loo & laundry



Upstairs we have the study, bathroom and bedrooms





Upstairs landing and stairwell




Downstairs landing